Steel structures

New Web site 2.0

SAVING

Pre-fabrication, architectural integration, fixing methodologies and the quick assembly lead to saving.

In spite of complex shape buildings the time to complete a work is always reduced and so are the yard costs.

 

An example: only 7 days for the assembly of the structural part of a villa.

 

 

 

Villa Vigevano  (PV)PArticolare costruttivo della colonna

Geom. Scussolin

Construction Mech srl

On the right detail of pre-fabrication