New Web site 2.0

A complex and unusual geometry, a structure made up with 4000 embossed steel beams, assembled with a tolerance of about 2 mm: a work achieved with the help of modern computer software for design and drawing. Data processing contribution allows a higher grade of accuracy and a big reduction of working time.
Grandstand of Sébastien Charléty Stadium, Paris, France
Architects: Henri et Bruno Gaudin, Paris
Structural engineers: OTH, Paris
Completed in 1994